Liwan District, Guangzhou City Pukou pumping station project

This tendering project has been approved by Sui Faxing [2013] No. 194. The project owner is the Liwan District Waterworks Facilities Management Center of Guangzhou City. The construction funds are from financial funds and the construction funds have been implemented. The project has already met the conditions for tendering and is now conducting an open tender for the construction of the Xinkouyong Pumping Station project in Liwan District, Guangzhou City.

2. Project overview and scope of tender
2.1 Construction Site: Liwan District, Guangzhou City;
2.2 Project Scale: The project cost is 40,133,205,050,000 yuan, which depends on the construction drawings and the project quantity list.
2.3 Plan Duration: 180 calendar days.
2.4 Bidding scope and division of bids:
2.4.1 The project is divided into 1 bids
2.4.2 Bidding scope: A new pumping station (level 1) will be built to build pumping house flow paths, pump rooms and discharge basins. The design flow rate of the pump station is 4.4m / s. Two 900GZ-125 flow-through pumps (132kW for a single motor) are used. They are arranged on both sides of the gully gutter. For details, see the engineering drawings and bill of quantities.
3. Bidder qualification requirements
3.1 With a valid business license, the foreign bidders should also provide a copy of the business license of the Guangzhou subsidiary, branch or branch in the Guangzhou area.
3.2 Qualification Level: Qualified with Grade A or above qualification for general contracting of water conservancy and hydropower projects.
3.3 Safety Production License: It has a safety production license issued by the competent administrative department and is within the validity period.
3.4 Person in charge of the project: Qualified as a registered builder with a water conservancy and hydropower professional level of at least grade level or above, aged 60 or below (up to December 2016, registered with the registered certificate of the registered architect), and bid applicants (IC card) The registered personnel in the company also have a production safety assessment certificate issued by the competent administrative department (Class B) and within the validity period, if they are overdue, they must provide the information of the production safety management information system and production safety management personnel of the Guangdong construction company management personnel. Print page.
Note: The professional and grade standards of the constructors are according to the "Administrative Measures for Registered Constructors' Practice (Trial)" and the "Standards for Registered Architects' Project Scale for Projects (Trial)"; the registered builders include registered temporary builders who have successfully registered. According to the Notice of the Guangdong Provincial Department of Construction “On the Clear Issues Concerning Issues Concerning the Registration and Practice of Secondary Architects Entering Guangdong Province” (Guangdong Construction Letter No. 〔2011〕 No. 218), the qualification certificate and registration certificate for secondary constructors are only for the administrative Effective within the region, no practice across provinces. The person in charge of the project may not serve as a full-time security officer during his term of office, and the full-time security officer of the project may not serve as the project leader during his term of office.
The project proponent proposed by the bidder should not be locked by the trading center in Guangzhou and other provinces or provinces at the time of registration. The person in charge of the project will be locked after the bid. If at the time of registration it was found that the person in charge of the project was locked by other projects within or outside the province, the bidder’s registration would not be accepted. The project proponent proposed by the bidder shall, if verified after registration, serve in the construction of other projects within the province or outside the province (with the acceptance of the unit project as the boundary), cancel the bid and qualification of the bidder. The unlocking and replacement of the person in charge of the project shall be handled in accordance with the “Guidelines for the Replacement and Unlocking of Personnel in Charge of Water Construction Projects in Guangzhou City”.
3.5 full-time safety officer: number: 1 person, professional requirements: /. Should have an effective production safety assessment certificate (C certificate) issued by the competent administrative department. If it is overdue, it must provide the printed page of the certificate of the production safety management personnel of the safety management appraisal system for construction enterprises in Guangdong Province, and specify the construction site balance. The mud and soil transport and discharge managers are concurrently employed by the construction full-time safety officer.
Note: See Jian Jian [2008] No. 91 "Notice on Printing and Distributing": No less than 1 project for 50 million yuan; no less than 2 projects for 50 million to 100 million yuan; 100 million yuan or more project Not less than 3 people, and professionally equipped with professional safety management personnel.
3.6 Requirements for similar project performance: The bidding applicant must independently complete the construction cost of over 2.5 million yuan (including 2.5 million yuan) from December 1, 2013 (upon the time of the notification of winning the bid). The cost is based on the notification of winning the bid. ) Qualified water conservancy projects. It is necessary to provide copies of information such as webpage printouts and web sites, tender notifications, contracts, unit project acceptance appraisal or project completion acceptance appraisal, etc., as well as the originals for future reference; tender notices and bid information provided. The web page printouts and URLs must come from the public trading platform specified in the tender announcement; information similar to the performance certification must clearly indicate the name of the performance project, the bid price, and the project size.
Note: Similar performances provided by bidders are subject to verification by the Qualifications Review Board or Bid Evaluation Committee. If the provided web page prints cannot be found through the web site or is inconsistent with the enquired bid announcement or winning bid information, the performance certificate is invalid; similar performance and qualifications The result of the pre-trial or the result of the successful candidate is publicized.
3.7 The Bidder shall submit a “Notice of Inquiries of the Prosecutor’s Office for Enquiring Bribery Files” issued by the location of the project or the prosecutor's office of the place where the company is registered to prove that the bidder, legal representative and project leader have no criminal records of bribery within 3 years before the date of the announcement of the tender.
3.8 Social Security Assurance Documents: The bid applicant shall ensure that the entrusted agent, project leader, and full-time safety officer are the legal employees of the unit, and must have three consecutive consecutive months from September 2016 (including September, October, and November). The social security documents (months or more) of the social security documents paid by the organization (or the "insured forms" or the "certificate of social insurance applicants" stamped with the seal of the social insurance fund management center).
3.9 Bid Applicants have applied for Class A credit files of enterprises in Guangzhou Municipal Construction Publicity and Education and Construction Industry Labor Management Center before the bid registration, and will not accept bids within the validity period.
3.10 Bid for Consortium: This consortium does not accept consortium bids.
3.11 The bid applicant may not have one of the following circumstances:
(1) An affiliate (unit) that does not have independent legal personality as the bidder;
(2) Providing design or consulting services for the preliminary preparation of the tendering project;
(3) The supervisor of this tender project;
(4) The agent of this bidding project;
(5) Providing tender agency services for this tender project;
(6) Being a legal representative together with the supervisor or agent or bid agency of the bidding project;
(7) Holding or participating in shares with the supervisor or agent or tender agency of the tender project;
(8) Working with or working with the supervisor or agent or bid agency of the tendering project;
(9) was ordered to suspend business;
(10) being suspended or canceled;
(11) The property was taken over or frozen;
(12) The unit owners of different applicants are the same person or different units that have a controlling relationship or a management relationship, and participate in the bid for the same tender item or the same tender item that is not divided into bid segments.
(13) Applicants and project proponents in the past year (from December 1st, 2015 to present) have bad behaviors in the relevant fields of project construction such as safety production, contract implementation, bidding and tendering, etc. Cancel bid qualification.
4, bid security and registration fee:
(1) The bid registration fee is 100 yuan/bid, which is charged by the trading center. The bidding document fee is 500 yuan/set (including 1 set of electronic CDs for drawing), which will not be refunded after sale.
(2) The bid security is 50,000 yuan. The bid security must be submitted to the designated account in Guangzhou before the deadline for bid submission. See tender documents for details.
5, the release of tender notices, registration and submission of tender documents
5.1 Announcement and registration time (not less than 5 days):
Announcement date (including today): December 30, 2016, from 00:00:00 to January 29, 2017, 23:59:59.
Registration time (including today): 9:30 on December 30, 2016 to 16:00 on January 6, 2017 (except on the statutory public holidays)

HJT Solar Panel

Sunket has launched HJT solar modules, which have the following 10 advantages:

1) Higher conversion efficiency: higher installed capacity within a limited installation area and lower BOS cost;
2) Higher reliability: Our product design is mature and has been tested by the market. Compared with large-sized components, it is more effective in resisting wind load and snow pressure, and it is not easy to cause frame damage, glass burst, and a large number of hidden cracks to cause excessive attenuation of components. ;
3) Low attenuation rate: 90% power line quality guarantee is still available after 30 years of use;
4) Low temperature coefficient of -0.24%: 2%-3.9% higher power generation per watt compared to conventional PERC;
5) Better low-light power generation performance: HJT adopts N-type silicon wafer technology, which generates 1% more electricity per watt compared to single crystal PERC;
6) No PID, no LID attenuation: lower attenuation of components in the whole life cycle and higher power generation;
7) Double-sided rate as high as 90%+: the backside of our heterojunction modules can have more than 90% and at least 423W of backside power generation, and the power generation superposition is higher after double-sided installation;
8) Lower LCOE: At present, compared with PERC single crystal technology, our heterojunction technology is more advanced, achieving the lowest LCOE of power generation, faster payback period and maximum benefit;
9) Good matching: suitable for photovoltaic grid-connected inverters and photovoltaic tracking brackets used in domestic mainstream;
10) Cost-effective.

HJT Solar,HJT Solar Panel,HJT Solar PV Module,HJT Solar Module,HJT PV Module

Wuxi Sunket New Energy Technology Co.,Ltd , https://www.sunketsolar.com