- Model NO.: LS-P08
- Conductor Circuit: Multi Circuit
- Materials: Steel
- Style: Cable Tower
- Name: Galvanized Power Transmission Line Steel Tower
- Height: 20--100m
- Spare Parts: Parts for Connection or Installation
- Installation on Site: Yes
- Payment Way: 30% Down Payment
- Trademark: LU STAR
- Specification: Transmission tower
- HS Code: 73082000
- Usage: Flying Angle Tower, Crossing Tower, Tension Tower, Angle Tower, Terminal Tower, Transposition Tower, Branching Tower
- Certification: ISO
- Standard: Standard
- Structure: F Type
- Shape: Round Face/Polygonal Face
- Appearance: Hot-DIP-Galvanized Steel Poles
- Wind Speed: 75(100),100(130),120(160),130(150)...
- Worker Training: Yes
- Lifespan: 25 Years
- Transport Package: by Sea or Land
- Origin: China
500kV 220kV Galvanized Power Transmission Line Steel Tower Power Tower
Power transmission towers can support the structure of high voltage or ultrahigh voltage overhead transmission lines and lightning protection lines.Specification:
Steel |
Yield Strength (MPa) |
standard | Standard Title | Metallic element | Content |  |
main ingredient  Q345 |
345 for Thickness <=16 |
GB/TÂ 1591-2008 |
High strength low alloy structural steels |
C | ≤0.20 |  |
Mn |  ≤1.70 |  | ||||
(ASTMÂ A572/A572M-15Â , EN10025Â S355N) |
Si | ≤0.50 |  | |||
Accessories Q235 | 235 | GB/T 700-2006 | Carbon structural steels | P | ≤0.035 |  |
 | ||||||
(ASTMÂ A283Â Gr.BÂ , EN10025Â S235JR) |
S | ≤0.035 |  |
Hot dip galvanizing | Standard | Steel thickness/mm |
Mean coating thickness/μm |
Metallic element | Content |  |
Pole shafts,cross arms&bolted on accessories |
ASTMÂ A123/ A123M-15Â AS/ NZSÂ 4680 |
>6 | 85 | Mn | 0.25%-0.40% | Â |
 | ||||||
<3-6 | 70 | Â | ||||
1.5-3 | 55 | Cu | <0.15% | Â | ||
 | ||||||
<1.5 | 55 | Â | ||||
Bolts,nuts&washers | GB/T 5267.3-2008 |   _____ | ≥ 54 | P | <0.025% |  |
 | ||||||
(ISOÂ 10684-2004) | Â | |||||
Foundation bolts |
ASTMÂ A153/ A153M-09 |
  _____ | ≥ 54 | S | <0.03% |  |
 |
Advantages:
Steel pole tower /angle steel towerÂ
1.Our products have high resistivity against heat, humidity, moisture, water etc.Â
2.Owning to use the rare earth special craft during the production process, to ensure its high precision, good quality and competitive advantage. Meanwhile, we can accept the product type damage test to ensure the high safe factor of our products.Â
3.Because of good quality and competitive price caused by innovation and management reform, experienced service in fabrication, design, installment, consultancy, we have built longterm relationship with many countries, such as America, Bangladesh, Sir Lanka, Russia, Jordan, Guyana, Nigeria, Australia, Spain, Indonesia, Singapore, the Philippines, etc.Â
Performance Standard :
Besides conforms to the drawing and design, the materials and fabrication of tower components shall conform to the following standards (Chinese Standards) and customer's requirements.Â
Steel pipe/angle/hybrid tower welding requirementsÂ
1).we used CO2 welding and submerged arc auto welding or other methods.Â
2).Welded seam shall be full penetration and grinded.Â
3).The welded product has no fissure, scar, overlap, layer or other defects.Â
Steel tower Galvanization/color painting
All steel items ,bolts ,nuts ,washers & other components to be hot -dip galvanized with uniform. As per (ASTM-A-123).paiting for corrosion proof
Related Production:
Power Transmission Line Tower
Communication Tower
Substation Steel Structure
Flare Tower
LSAW Steel Pipe
Our Project
>>.Ethiopian 400kv substation
>>.Macao University of Science&Technolofy Stadium
>>.The China Petroleum University Gymnasium
>>.Wuhan Qiantai Theater
>>.The Stadium Of Zibo City
>>.Huizhou Stadium
Quality Test:
Before put into production, all the material must pass the chemical and physical analysis to make sure that they have met the requested strength and component. we have more than 15 inspection procedures from incoming raw material to finished products.
Company Advantage:
1. The company has advanced digital physical and chemical laboratory.  Â
2. We have one 3000 tons CNC bending machine, have two domestic advanced digital automatic production line for steel pipe tower, have 6 automatic numerical control robot welding system, havetwo Steel tube joint welding machine , have 4 CNC plasma flame cutting machine, have 6 High
speed CNC Angle steel line and steel plate production line, one CNC tower foot welding robot system. ,2 CNC Plane drilling machine,1 sand shot blasting machine, 1 gantry type submerged arc
welding machine.6 cutting/shearing machine Â
3. Annual production capacity of 200, 00 tons of hot galvanizing line and one Automatic  centrifugal bolt galvanizing line.Â
Delivery Period :
(1) Less than 100ton: Within 1 Months after receiving the advance payment.Â
(2) 100ton ~ 300ton: Within 2 Months after receiving the advance payment.Â
(3) 300ton ~ 600ton: Within 3 Months after receiving the advance payment.Â
(4) 600ton ~ 1500ton: Within 4 Months after receiving the advance payment.Â
Why Choose us?Â
* Tower Design tailor made to your requirementsÂ
* Pre Dispatch inspection by buyer or international inspection agency.Â
* Steel certified as per international.Â
* Design of Tower as per China/ International design standards.Â
* Galvanization as per international standard.Â
* Timely project completion.Â
* Convenient transportation to Qingdao port & airport(only one hour)
* We are manufacturer. We have our own land & factory. The land was bought instead of rent.
* Independent import & export authorization from government.
* Price is competitive
Â
Ningbo Wewinmagnet Co.,Ltd , http://www.wewinmagnet.com