Construction management of road lighting project

I. Scientifically prepare the construction plan of the project

First, organize the construction drawings and related materials of the streetlight project, investigate the construction conditions of the project, determine the division of the construction process according to the commencement and completion date specified by the superior, and arrange a reasonable construction sequence. Secondly, the construction budget is proposed, the actual engineering quantity of each construction process is calculated, and the labor demand and the mechanical shift demand are determined. According to the labor and mechanical supply capacity, the design and construction schedule is planned, and the labor and material information needs to be planned.

Second, organize the construction of water flow

The construction of the flow-through operation is characterized by the continuity and balance of the construction. It can fully mobilize the enthusiasm and cooperation of various functional departments, make the various materials use in a balanced manner, greatly improve the production efficiency, and help improve the quality of the project and ensure the safety of construction. As far as the street lamp project is concerned, it can be divided into two parts: underground civil construction and ground installation. According to the principle of “first underground and then on the ground”, the pipeline construction, pipeline inspection well, lamp pole foundation and power cable of underground civil construction should be implemented first. Construction; post-installation of the installation of the pole, lamp holder, light source electrical installation and power supply system construction.

Third, strengthen the construction guidance and quality acceptance of underground concealed projects

The road lighting pipeline network, inspection wells, pole foundation and power cable are the infrastructure of the streetlight project, and are hidden in the ground. The construction quality is directly related to whether the whole project can be put into operation safely. Therefore, it must be in accordance with the road during construction. Lighting design requirements and procedures to strengthen guidance and inspection, strict quality inspection and acceptance. Among them, pay special attention to the following two points. First, before the construction, first contact with the relevant underground pipeline units, and carefully grasp the specific location of the underground pipeline network. During the construction process, if the streetlight pipeline network, inspection well and lamp foundation conflict with other unit pipeline networks, If the original design plan needs to be changed, it must be approved by the road lighting design department before the design can be changed, and then the construction is completed and the construction change record is made in time. Second, in the construction of power cables, special attention should be paid to the damage of the cable sheath and the inner wire to ensure the normal operation of the road lighting line lights. In short, the underground project should be “strict, detailed and practical”, laying a solid foundation for the entire project.

Fourth, efforts to improve the quality of the details of the installation on the ground

Since the poles and lamps are an important part of the beautiful scenery of the road, in addition to the need to firmly install the poles and lamps, it is necessary to ensure the verticality of the poles and the ground, the consistency of the elevation angle of the lamps and the overall uniformity. While improving the quality of the above-mentioned details, it is necessary to select the transformer capacity reasonably. Because the power supply radius of the street lamp line is small and the voltage is stable, it is conducive to operation and maintenance. Even if one road fails, the other road can supply power as usual without causing the entire road to be out of the light.

In short, the construction management of streetlight projects is not limited to thousands of items. The most important thing depends on the responsibility and dedication of the project manager. It is necessary to fully grasp the construction progress, quality and safety. When there is conflict between progress, quality and safety, We must adhere to quality first, safety first, scientifically and reasonably organize construction under the premise of insisting on quality and ensuring safety, and speed up construction progress.

Table Blender is Stand Blender with different size jar, it has AC motor and DC motor version, high speed, novel design, LED screen control, injection ABS or PP or stainless steel body, 0.5L/1L/1.2L/1.5L/1.8L/2L plastic/glass/stainless steel blender jar/Chopper/slicer/dry grinder/electronic scale, make all kind of food as fruit juice, vegetable juice, soybean milk, sesame paste, meat slice, coffee, garlic, grated ginger, ground peper, carrot piece etc. It got GS/CB/CE/EMC/LVD/ROHS/Erp/LFGB/RAACH safety certificate with competitive price 

Table Blender

Table Blender,Household Table Blender,Multifunctional Table Blender,Plastic Jar Table Blender

Jiangmen Oudisi Electric Co., Ltd. , http://www.oudisi-electric.com