1. Bidding conditions
The tender project Haimen City Water Supply Company's Yangtze River Water Plant Greening Landscape Improvement Project (project name) has been approved by the Haimen City Housing and Urban-Rural Construction Bureau. The date of approval was October 19, 2017. The project owner is Haimen Water Supply Company. The bidder is Haimen Water Supply Company, and the construction fund comes from the company's self-raising (fund source). The project has already met the conditions for bidding. The project is now undergoing open bidding.
2. Project overview and scope of tender
(1) Project location: in the Yangtze River water plant;
(2) Project scale: The estimated investment is 5.0161692 million yuan;
(3) The scope of the tender: See the construction drawing and the "Quantity List" for details;
(4) Plan duration: 120 calendar days;
(5) Quality requirements: Qualified;
(6) Bid segmentation and bidding content (a bid section):
Bid Section Bidding Content Contract Price
(10,000 yuan) Applicant
Qualification category and rating Project leader
grade
1. Upgrade and Renovation Project for Greening Landscape of Jiangshui Factory 501.6692 Construction and Qualification for General Contracting of Municipal and Public Works with Grade A and above. Have a valid safety production license issued by the construction administrative department; Qualifications of registered construction engineers of grade one and above in the municipal engineering profession (including temporary registration and registration in this unit).
3. Bidder qualification requirements
3.1 The bid invitation requires the bidder to have the construction qualifications of the general contracting of the municipal public project and above, and has the corresponding construction capabilities in terms of personnel, equipment, funds, etc., among which, the bidder intends to assign the project leader to have the municipal engineering expertise. Grades and above registered builder qualifications (including temporary).
The following conditions are the necessary qualifications for qualification review:
(1) Has the ability to independently conclude contracts;
(2) It is not in the state that it has been ordered to suspend business, its qualifications have been cancelled, or its property has been taken over, frozen or bankrupted;
(3) The company has not been suspended from bidding due to problems such as fraudulent bid winning or serious breach of contract, major project quality, safety production accident, etc., and is within the suspension period;
(4) The enterprise's qualification category, grade, and qualification level of the project leader meet the tender announcement requirements;
(5) The important contents in the qualification examination documents are not inaccurate or falsified;
(6) The company has safe production conditions and obtains a safety production license;
(7) Proposed project leader is not under construction;
(8) Proposed project leader is a formal employee of the bidding company and shall not be part-time; commissioned agent (if any), proposed main project management staff (technical person in charge, construction worker, quality member, safety officer) shall be the formal personnel of the bidding company. ;
(9) Performance requirements of the company: Since May 1, 2012, the company has undertaken the construction of landscape or greening or ecological bank protection projects with a contractual cost of more than 2 million yuan.
(10) The company and the proposed project leader have no criminal records of bribery;
3.2 This tender does not accept (accept or not accept) the Commonwealth bid.
3.3 Each bidder may bid for 1 (specific quantity) bids in the above bid section of the bidding project, but a maximum of 1 (specific quantity) bids may be awarded.
4. Acquisition of tender documents
4.2 The bidding documents are priced at RMB 255.00 each and will not be refunded after sale.
5. Submitting bid documents
5.1 The deadline for submission of bid documents (tender deadline, the same below) is at 9:00 on December 26, 2017.
LCD TFT
LCD (short for Liquid Crystal Display) liquid crystal display. The LCD structure is to place a liquid crystal cell between two parallel glass substrates. The lower substrate glass is equipped with TFT (Thin Film Transistor), and the upper substrate glass is equipped with a color filter. The liquid crystal molecules are controlled by the signal and voltage changes on the TFT. Rotate the direction, so as to control whether the polarized light of each pixel point is emitted or not to achieve the purpose of display. LCD has replaced CRT as the mainstream, and the price has dropped a lot, and it has become fully popular.
According to data from CINNO Research, 2020 is expected to be the first year for mass production of mobile phones with fingerprint recognition under LCD screens.
LCD features:
(1) Low-voltage micro power consumption
(2) The appearance is small and exquisite, the thickness is only 6.5~8mm
(3) Passive display type (no glare, no irritation to human eyes, and no eye fatigue)
(4) The amount of display information is large (because the pixels can be made small)
(5) Easy to colorize (reproduce very accurately on the chromatogram)
(6) No electromagnetic radiation (safe for the human body, conducive to information confidentiality)
(7) Long life (this kind of device has almost no deterioration problem, so the life is extremely long, but the life of the LCD backlight is limited, but the backlight part can be replaced)
Lcd Tft,Tft Lcd Led Projector,Tft Lcd Library,LCD panels
Shenzhen Newvision Technology Co.Ltd , https://www.newvisionlcd.com